Packaging line with  raw material supply by belt conveyor

productivity 1500 kg/hour

includes:

band conveyer

charging hopper

packing unit with two nozzles and table adjustable in height

electronic scales - 2 pieces

aspiration system with

rumble with exchangeable grids to divide coal into fractions

feed rate control

Terms of manufacturing – 21 workdays

Price on terms FCA Kostopol, Ukraine – 7 150 $

 

Packaging line with  raw material supply by belt and screw conveyors

productivity 1500 kg/hour

includes:

band conveyer

screw conveyor (for grinding coal)

loading hopper

packing unit with two nozzles and a table adjustable in height

electronic scales - 2 pcs.

cyclone suction system

feed rate adjustment

screen with interchangeable nets for dividing coal into fractions

 

Terms of manufacturing – 21 workdays

Price on terms FCA  Kostopol, Ukraine – 8 150 $

 

What is the difference between setting a feed screw conveyor

and the belt conveyor ?

Belt and screw conveyor - When fed by a screw conveyor to a conveyor

belt, there is no need to grind the charcoal to the required fraction -

this is done by the screw.

Belt conveyer

There is no crushing of coal to a fraction of the desired size

mechanically.

02000,Kiev,Ukraine, impextreiding@gmail.com, +38 050 4416313

  • Facebook Social Icon
  • YouTube Social  Icon